References

Passenger simulation at the London City Airport (LCY)

Passenger simulation at the London City Airport (LCY)

November 2022 | Customer: Single European Sky ATM Research (SESAR) | Airport Planning

Passenger simulation at the London City Airport (LCY) in the research project IMHOTEP, in which the effects of disruptions during the aircraft turnaround process on passenger flows in the terminal were investigated.

Obstacle monitoring at Frankfurt/Main Airport

Obstacle monitoring at Frankfurt/Main Airport

July 2021 | Customer: Frankfurt Airport | Airport Planning

Evaluation and optimization of obstacle monitoring processes and the electronic obstacle register as well as an evaluation of the obstacle situation with regard to the currently valid obstacle free zones at Frankfurt/Main Airport.

Training and competency testing programs as part of compliance management at Munich Airport

Training and competency testing programs as part of compliance management at Munich Airport

April 2019 | Customer: Airport Munich | Airport Planning

Support in the design of training and competency testing programs as part of compliance management at Munich Airport

Building protection investigation at the special landing site Hamburg Finkenwerder

Building protection investigation at the special landing site Hamburg Finkenwerder

April 2019 | Customer: Airbus Deutschland GmbH | Airport Planning

Updating of the investigations for the planned establishment of a building protection area according to § 12 LuftVG at the special airfield Hamburg-Finkenwerder

Capacity analysis Leipzig/Halle Airport

Capacity analysis Leipzig/Halle Airport

January 2019 | Customer: Leipzig/Halle Airport | Airport Planning

Analytical determination of the runway and stand capacity

Testing for EASA compatibility of Nuremberg Airport when operating aircraft with higher ICAO code letter

Testing for EASA compatibility of Nuremberg Airport when operating aircraft with higher ICAO code letter

September 2018 | Customer: Airport Nürnberg | Airport Planning

Analysis and evaluation of the safe flight operation of (a few) aircraft requiring a higher EASA airfield reference code according to EASA AMC1/GM1 ADR:OPS.B090 - Use of the aerodrome by higher code letter aircraft.

Safety assessment for the partial renewal of the runway at Stuttgart Airport

Safety assessment for the partial renewal of the runway at Stuttgart Airport

August 2018 | Customer: Stuttgart Airport | Airport Planning

Examination and evaluation of the safety of operations during the temporary, infrastructural and procedural measures planned by FSG during the construction phases for the partial renewal of the runway.